“Eternity is said not to be an extension of time but an absence of time.”

Source: The End of the Affair

Last update June 3, 2021. History

Help us to complete the source, original and additional information

Do you have more details about the quote "Eternity is said not to be an extension of time but an absence of time." by Graham Greene?
Graham Greene photo
Graham Greene 164
English writer, playwright and literary critic 1904–1991

Related quotes

Graham Greene photo
Emil M. Cioran photo

“Eternity is absence.”

Emil M. Cioran (1911–1995) Romanian philosopher and essayist

Drawn and Quartered (1983)

Antonin Artaud photo

“It is not opium which makes me work but its absence, and in order for me to feel its absence it must from time to time be present.”

Antonin Artaud (1896–1948) French-Occitanian poet, playwright, actor and theatre director

Appeal to Youth: Intoxication-Disintoxication (1934).

“Hell […] is the absence of God and the presence of Time.”

Source: I, Lucifer

Isaac Leib Peretz photo

“Time is change, transformation, evolution. Time is eternal sprouting, blossoming, the eternal tomorrow.”

Isaac Leib Peretz (1852–1915) Yiddish language author and playwright

Hofnung un Shrek, 1906. Alle Verk, xiii. 9.

Angelus Silesius photo

“Time is eternity and eternity is time, just as long as you yourself don't make them different”

Angelus Silesius (1624–1677) German writer

The Cherubinic Wanderer

Joseph Campbell photo

“Eternity isn't some later time. Eternity isn't a long time. Eternity has nothing to do with time. Eternity is that dimension of here and now which thinking and time cuts out. This is it. And if you don't get it here, you won't get it anywhere. And the experience of eternity right here and now is the function of life.”

Episode 2, Chapter 13-14
The Power of Myth (1988)
Context: Campbell: Eternity isn't some later time. Eternity isn't a long time. Eternity has nothing to do with time. Eternity is that dimension of here and now which thinking and time cuts out. This is it. And if you don't get it here, you won't get it anywhere. And the experience of eternity right here and now is the function of life. There's a wonderful formula that the Buddhists have for the Bodhisattva, the one whose being (sattva) is illumination (bodhi), who realizes his identity with eternity and at the same time his participation in time. And the attitude is not to withdraw from the world when you realize how horrible it is, but to realize that this horror is simply the foreground of a wonder and to come back and participate in it. "All life is sorrowful" is the first Buddhist saying, and it is. It wouldn't be life if there were not temporality involved which is sorrow. Loss, loss, loss.
Moyers: That's a pessimistic note.
Campbell: Well, you have to say yes to it, you have to say it's great this way. It's the way God intended it.

William Blake photo

“Time is the mercy of Eternity; without Time's swiftness Which is the swiftest of all things, all were eternal torment.”

William Blake (1757–1827) English Romantic poet and artist

Book the First, 24:72
1800s, Milton (c. 1809)

Diogenes Laërtius photo

“Time is the image of eternity.”

Diogenes Laërtius (180–240) biographer of ancient Greek philosophers

Plato, 41.
The Lives and Opinions of Eminent Philosophers (c. 200 A.D.), Book 3: Plato

Mark Twain photo

“Describing her first day back in grade school after a long absence, a teacher said, "It was like trying to hold 35 corks under water at the same time."”

Mark Twain (1835–1910) American author and humorist

Incorrectly attributed to Twain, this is actually a quotation from an article in The Pocono Record (18 February 1971, page 4 http://www.newspapers.com/newspage/40447792/)
Misattributed

Related topics